Application scenarios: A large amount of white smoke will be produced during the production of asphalt stone in an asphalt factory in Hangzhou, resulting in thick smoke billowing nearby and affecting the landscape of the factory.
Treatment scale: The flue gas volume is 120000Nm³/h and the flue gas temperature is 100℃.
Transformation technology: Adopt "condensing + reheat" bleaching technical route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Application scenarios: A large amount of white smoke was produced in the production process of an energy company in Jiangsu province, resulting in thick smoke billowing nearby and affecting the landscape of the factory.
Treatment scale: The flue gas volume treated by the system is 130000Nm³/h, and the flue gas temperature is 100℃.
Transformation technology: Adopt "direct heating" bleaching technology route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Application scenarios: A large amount of white smoke is produced in the boiler operation of a power plant in Shandong province, resulting in thick smoke billowing nearby and affecting the landscape of the plant.
Treatment scale: The flue gas volume is 650,000 nm ³/h and the flue gas temperature is 60℃.
Transformation technology: Adopt "MGGH" whitening technology route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Application scenarios: A large amount of white smoke will be produced during the boiler operation of a coking plant in Shaanxi province, resulting in thick smoke billowing nearby and affecting the landscape of the plant.
Treatment scale: The flue gas volume processed by the system is 800000Nm³/h, and the flue gas temperature is 60℃.
Transformation technology: Adopt "MGGH" whitening technology route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Application scenarios: The temperature and humidity of a natural gas boiler exhaust in hangzhou energy company are large, resulting in a large number of white smoke plume at the chimney mouth.
Treatment scale: The flue gas volume is 45000Nm³/h and the flue gas temperature is 60℃.
Transformation technology: Adopt "superconducting endothermic + condensation + superconducting exothermic" whitening technical route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Waste heat recovery: After the transformation, the system recovered 620kW heat load, converted down to save 62Nm³ of natural gas per hour
Pictures show: Shut down and open chimney No. 1 whitening system
Application scenarios: A Anhui chemical company produces a lot of white smoke in the process of chemical raw materials, resulting in visual pollution.
Treatment scale: The flue gas volume is 30000Nm³/h and the flue gas temperature is 70℃.
Transformation technology: Adopt "condensing + reheat" bleaching technical route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%